INFORMATION RELEASE AB 191/2
INSTALLATION CHECKLIST QF509B & QF510
This Admin Bulletin 191/2 replaces the original Admin Bulletin 191
1 With effect from the beginning of April
1999 EDP introduced the
Installation Check List
Form QF509.
This has now been amended and
becomes
System Installation Check List
Form QF509B
WAN Installation Check List
Form QF510
They are to be used from May 2001 onwards.
2 Samples are shown overleaf, they are an
aide-memoire, designed to help you ensure that installations are completed
correctly.
3 With every installation sent from GDC there will
be a copy of the relevant form(s).
Production are responsible for ensuring
that a copy of QF509B/QF510 goes with each system/WAN equipment.
4 The installation engineer is responsible for
completing the QF509B and or the QF510. To complete the QF509B/QF510; enter
the Customer Name, Location, System or
Equipment Type and Date at the top; and Print their name at the bottom. Then all
that is required is a tick in the YES
or NO box for each of the items; then Sign at the bottom.
Any NO tick will require a more
detailed comment on the back of the form.
NOTE, for the WAN Installation Check
List, QF510; unless the Installation Engineer visits/accesses both the Main and
Remote Sites, there should be some ticks
in the NO boxes.
5 When completed, the installation engineer is
responsible for forwarding the QF509B and or the QF510, together with the
Installation Certificate (IC); to the Customer
Services Supervisor (CSS) The CSS is responsible for checking the
QF509B/QF510/IC and ensuring that any relevant
action is taken. The CSS is then to forward the QF509B/QF510/IC to GDC.
GDC will then forward the QF509B / QF510 to
Contracts at Beauchief Hall for final filing.
6 If you can think of anything that should be included;
or ways of improving or making it more effective, then please forward your
thoughts to Technical Services at Linford Wood.