INFORMATION RELEASE AB 191

edplogo.gif (5330 bytes)

  1. With effect from the beginning of April 1999 EDP introduce the Installation Check List Form QF509.
  2. A sample is shown overleaf. It is an aide-memoire, designed to help you ensure that installations are completed correctly.
  3. With every system for installation sent from GDC there will be a copy of the form.
    Production are responsible for ensuring that a copy of QF509 goes with every system.
  4. The installation engineer is responsible for completing the QF509 and returning it with the Installation Certificate to Engineering Admin at Linford Wood.

  5. To complete the QF509 the Installation Engineer is to enter the Customer Name, System Type and Date at the top and Print their name at the bottom. All that is required is a tick in the YES or NO box for each of the 20 items. Then Sign at the bottom.
    Any NO tick will require a more detailed comment on the back of the form, as well as carrying out the relevant reporting action and documentation.

  6. If you can think of anything that should be included in the QF509; or ways of improving or making it more effective, then please forward your thoughts to Technical Services at Linford Wood.