FECO LVC # 2

 

FECO: LVC # 2.
MODIFICATION NO: N/A
PRODUCT: .SOLA 2KVA LVC
SUB-ASSEMBLY: N/A
ESTIMATED MAN HOURS: N/A
CLASS OF CHANGE: MANDATORY
REASON FOR CHANGE: TO LIST THE REVISED INSTALLATION PROCEDURE FOR THE HARDWIRED 2KVA LVC.

 

  1. Further to feco lvc # 1 this feco lists the installation and connection procedure for the sola 2kva lvc, model no. Mcr2000-h50, with a mec identity of ncr-2000-h50-lvc; as supplied to customers from 1997 onwards.

This configuration is only for 240 volt ac output from a 180 to 260 volt ac input.

  1. Extra requirements are:-

  2. Beading or grommets,

          Heavy gauge 4mm insulated earth wire and.

          Heavy gauge 4mm insulated link wire.

          These are to be provided by production.

  1. Mount the unit and secure as necessary with fixing screws/ bolts.

  2. Remove the end cover to access the hard wire terminals.

  3. Knock out the appropriate metal disks in the casing to enable cable entry, and fit the beading strip or grommets around the hole(s) to prevent chafing.

  4. Connect a shorting link of 4mm heavy gauge wire between h2 and h3, refer to diagram.

  5. Connect a link of 4mm heavy gauge earthing wire to x5 but do not connect it to the chassis earth tag yet.

  6. Ensure the input cable is isolated from the mains, then feed it through the hole in the casing, but do not connect anything yet.

  7. Feed the output cable through the hole in the casing, but do not connect anything yet.

  8. Connect all the earth’s, to the chassis earth tag.
  1. Connect the other outputs
  1. Connect the other inputs
  1. Replace the end cover.

  2. Make all external connections, apply power and test for function.

Return to Index